title Building Progress: Electrical Second Fixing, Brome, Suffolk - 4th March 2014 intro It's time to "second fix" Nosher's electrical installation - sticking the sockets and switches on to the new wiring in the conservatory, office and garage, which together comprises some three-quarters of a kilometre of cable, 20 double plug sockets, three separate ring mains, seven lighting circuits and three new consumer units, with the consumer units connected together over 10mm armoured cable. And it all works first time. imgc2449 Gov installs a new Consumer Unit imgc2451 Boomer works on sockets imgp5898 Gov marks out some trunking imgp5899 A neat stack of 20 Crabtree MCBs imgp5900 Boomer watches as Gov tests sockets imgp5902 More socket testing imgp5903 Boomer checks on the wiring regulations imgp5907 Harry, Fred and Amelia run around the room imgp5908 More second-fixing and wiring over in the garage imgp5909 Nosher's previous 1990s consumer unit imgp5912 Meanwhile, the old roof is partly re-done imgp5913 Andrew looks at the roof imgp5914 Old insulation from 1995 is exposed imgp5915 Lewis and Brian work on the old roof imgp5916 Multiple roofing action imgp5918 Millie the Mooch sleeps on a laptop imgp5920 Millie - invisible cat - wakes up