title Bathroom Rebuilding, Brome, Suffolk - 1st February 2002 intro The Old Chap comes over to help as the old bathroom, which dates from 1958, is removed and replaced with a modern toilet and a glass-block shower cubicle. Then, there's a bit of a plumbing issue as it's discovered that a radiator pipe has been leaking for ages and has filled up the small void under the lounge floor. dcp_1829 The old sink and bath have bene removed dcp_1830 The 1950s toilet dcp_1831 The Old Man pokes around near the toilet dcp_1832 The old chap works over a hole in the floor dcp_1834 Tiles for a new shower cublicle go on the wall dcp_1896 The A14 is full of mid-lane tossers again dcp_1897 A total mid-lane tosser dcp_1900 Michelle's under Nosher's desk for some reason dcp_1917 A radiator has been secretly leaking dcp_1918 There's water up the wall dcp_1920 The floorboards have become very warped dcp_1930 The Sock and Sophie have a sleep dcp_1936 A glass-block wall is built for the shower dcp_1937 A new toilet and a near-finished shower dcp_1945 The Weber carburettor has been cleaned up